Pumping Stations And Force Mains
Integration and upgrade of several wastewater lift stations for the City of Winkler with design and construction of large diameter force main of 4km to the City’s treatment system (aerated lagoon).
Pre-Design of biggest water transfer scheme in Manitoba for large irrigation scheme. Pre-Design included river intake, major pumping station with 2,000Lps capacity, 2x8km long large diameter pipelines and outlet structure.